Schedule Result
Optimized production flow · last generated 2026-07-26 09:14
Raw Aluminum
5,000 units in stock
Raw Steel
3,000 units in stock
Tool A1 — CNC
85.9h · $1,717
Tool D4 — Cutting
15.3h · $491
Tool C3 — Assembly
19.2h · $537
Tool B2 — Welding
36.8h · $883
on Tool A1
Lena Chen
69.0h · $1,932
on Tool D4
Luc Lopez
11.5h · $426
on Tool C3
Pablo Jain
19.2h · $594
Elena Khan
19.2h · $422
on Tool B2
Mia Chen
36.8h · $1,251
Ravi Nakamura
36.8h · $1,362
Product A — Aluminum Bracket
5,000
ETA Day 5
Product B — Steel Gear
3,000
ETA Day 3
Operators used
6
minimized from 9
Total labor-hours
192.4
across all shifts
Total cost
$9,615
machine + labor
Revenue / profit
$130,125
revenue $185,500 − materials $45,760
Completion
Day 5 of 7
2 days of slack
Convergence
GA converged in 200 gens · 18% cheaper than baseline
Operator Gantt
7-day schedule · gaps are breaks / cool-off periods
Constraint checks
15 of 18 rules satisfied